Louisville Tin and Stove BBT104, BBT53, BBT103, BBT54 INSTALLATION- Cont’d, Completing Installation

Models: BBT103 BBT104 BBT54 BBT53

1 26
Download 26 pages 37.89 Kb
Page 10
Image 10
STEP 7. COMPLETING INSTALLATION

INSTALLATION - Cont’d.

24 V.

Gas Baseboard

Thermostat

 

 

Gas Baseboard

 

Gas Baseboard

When wiring more than one baseboard heater to a single thermostat, the baseboard heaters must be wired in PARALLEL. When wiring more than one baseboard heater to a single 24 VAC thermostat, the baseboard heaters must be hard wired in parallel. Do not use cord sets. Do not cross thermostat connections between heaters. Purple thermostat connection from first heater to purple thermostat on second and third heater. Do the same with white thermostat connection.

FIGURE 10

e)The anticipator setting on the thermostat should be equivalent to the current draw of the total number of valves being controlled.

NUMBER OF BASEBOARD HEATERS

ANTICIPATOR SETTING

1

.1 AMP

2

.2 AMP

3

.3 AMP

 

 

STEP 7. COMPLETING INSTALLATION

a)Connect gas supply line to flex gas line/shut-off valve from heater.

b)Turn gas supply on. Check connections with soapy solution.

c)Plug power cord into grounded 115 V. outlet or turn power on if hard wired.

d)Replace cabinet cover and secure with three screws at bottom.

Heater is now installed, follow lighting instructions to put heater in operation.

During initial warm-up the heater may smoke slightly. Provide adequate ventilation should this occur.

Page 10

Page 10
Image 10
Louisville Tin and Stove BBT104, BBT53, BBT103, BBT54 warranty INSTALLATION- Cont’d, Completing Installation