. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installation Instructions
Installation Instructions
Tools and Equipment
You will need the following tools and equipment to unpack and install a
•Wrench (supplied in shipping crate) – to raise and lower the leveling glides
•Shears – to cut the metal bands on the shipping crate
•Forklift (optional) – to remove the cabinet from the shipping skid
•Communication cables (optional)– additional cables to attach the cabinet to the host
| 15 |