UV36
Combustible Mantel Clearances | Cabinet Installation |
|
| |
8" |
|
|
|
|
6" |
|
|
|
|
1" | 24" | 3" |
|
|
Noncombustible | 20" |
| 12" |
|
or Void | 12" |
|
| |
Standoff |
| 21" |
| |
| Noncombustible |
| ||
|
|
|
| |
9" |
|
| 9" |
|
|
|
| Canopy Installation |
|
17" |
|
| Hex Head Screws |
|
|
|
|
| |
|
|
| Canopy | T233 |
|
|
|
|
Fig. 3 Combustible mantel clearances.
Installing the Firebox
21���"
14���" | 1/2" |
|
This list of specific instructions will help you make cer- tain that every installation operation is done correctly. Complete the installation steps in the sequence shown.
36"
2” Minimum Clearance to Side Wall or Mantel Leg
1/2” Clearance Not Required at this Point
14���" Min.
LOCAL BUILDING CODES SHOULD BE CONSULTED IN ALL CASES AS TO THE PARTICULAR REQUIRE- MENTS CONCERNING THE INSTALLATION OF FAC- TORY BUILT VENT FREE FIREPLACES.
Select the location for the fireplace by taking into con- sideration the factors previously outlined in the Choos- ing the Location section of this manual.
Step 1: Framing the Firebox
The entire fireplace can be elevated above the floor to achieve a raised hearth effect. This can be done by adding a small platform to achieve the desired height. This platform must be a continuous surface extending the full width and depth of the fireplace.
STOP! INSTALL CANOPY AT THIS TIME BY LOOS- ENING THE SCREWS LOCATED AT THE TOP FRONT OF THE FIREPLACE. NEXT, SLIDE THE SLOTTED FLANGE OF THE CANOPY UNDER THE LOOSENED SCREWS, THEN RETIGHTEN THE SCREWS TO SECURE THE CANOPY. (Fig. 3)
36" |
|
|
| 36���" | ||||
" |
|
|
|
|
| |||
|
| 32��� |
|
|
| |||
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Step 2: Install the Firebox
Install the firebox into the framed opening by setting it directly in front of the opening and sliding it into the proper position.
Fig. 4 Framing dimensions.
6 | 20007446 |