P 6/ 14
Repair
[4]DISASSEMBLY/ASSEMBLY
[4]-6. Shaft pipe B complete
DISASSEMBLING
(1)Remove two M5x25 Hex socket head bolts and Pipe clamp 24 from Shaft pipe B complete. Clamp cover A, Pipe clamp 33 and Loop handle are removed. (Fig. 24)
(2)Remove four 4x18 Tapping screws and two M5x14 Hex socket head bolts from Control lever assembly. Control lever assembly is now separated to L and R. (Fig. 25)
(3)Loosen M5x12 Hex socket head bolt and M6x25 Hex socket head bolt, and remove Joint 24 from Shaft pipe B complete. (Fig. 26)
(4)Loosen M5x20 Pan head screw of Hanger set, and remove Hanger set itself and Spacer 24 from Shaft pipe B complete.
(Fig. 27)
(5)Pull out Shaft B complete from the pipe joint side of Shaft pipe B complete. (Fig. 28) Remove Retaining ring
Fig. 24 | Fig. 25 |
*Loop handle
*Pipe clamp 24
*M5x25 Hex socket head bolt (2 pcs.) *Clamp cover A
*Pipe clamp 33
*mark: The components of Loop handle set
Control lever assembly |
4x18 Tapping screw (4 pcs.) |
M5x14 Hex socket head bolt (2 pcs.) |
Fig. 26
Shaft B complete on Pipe joint side |
|
| M5x12 Hex socket |
| head bolt |
Joint 24 | M6x25 Hex socket |
| head bolt |
Fig. 27
Shaft B complete on Engine side |
Spacer 24 |
Hanger set |
(Hanger and M5x20 Pan head screw) |
Fig. 28
Pipe joint side of Shaft pipe B complete
Retaining ring
Joint end of Shaft B complete for installing the tool head
ASSEMBLING