UNPACKING | 1. | Remove all packing items applied to heater for shipment. | |
| 2. | Remove all items from carton. | |
| 3. | Check items for any shipping damage. If heater is damaged, promptly inform | |
|
| dealer where you bought heater. | |
ASSEMBLY | These models are furnished with wheels and handles. Wheels, handles, and the | ||
(For 90,000 and 150,000 | mounting hardware are found in the shipping carton. | ||
Tools Needed | |||
BTU/Hr Models Only) | |||
| • Medium Phillips Screwdriver | ||
| • 3/8" Open or Adjustable Wrench | ||
| • Hammer | ||
| 1. | Slide axle through wheel support frame. Install wheels on axle. | |
|
| IMPORTANT: When installing wheels, point extended hub of wheels toward | |
|
| wheel support frame (see Figure 4). | |
| 2. | Place cap nuts on axle ends. Gently tap with hammer to secure. | |
| 3. | Place heater on wheel support frame. Make sure air inlet end (rear) of heater is | |
|
| over wheels. Line up holes on fuel tank flange with holes on wheel support | |
|
| frame. | |
| 4. | Place front handle and rear handle on top of fuel tank flange. Insert screws | |
|
| through handles, fuel tank flange, and wheel support frame. Attach nut finger | |
|
| tight after each screw is inserted. | |
| 5. | After all screws are inserted, tighten nuts firmly. | |
|
| Front | |
|
| Handle |
Hot Air | Screw |
|
Outlet |
| Rear |
|
| |
|
| Handle |
Fuel |
| Air |
| Inlet | |
Tank |
| |
|
| |
Flange |
|
|
Wheel |
|
|
Support |
|
|
Frame |
|
|
Wheel | Nut |
|
Cap Nut |
| Extended |
| Axle | Hub |
| ASSEMBLY, EURO | PFA/PV 018A |
Figure 4 - Wheel and Handle Assembly, 90/150,000 BTU/Hr Models Only
5
100743