19

Step 20

A. Hood Handle

Attach the Hood Handle to the Hood with 2) 1/4-20 x .39” Bolts and Fiber Washers. Place Heat Baffles between the Handle and the Hood. Align Handle as shown in side view.

B. Thermometer Assembly (Model 6623S8Y641 ONLY)

Attach the Thermometer by inserting the sensor rod and threaded studs through the Hood. Be sure the graphics are oriented correctly when the hood is in the closed position. Fasten in place with 2) M5 Nuts and Washers.

1/4-20 x .39” Bolt - 2 pc

Fiber Washer - 2 pc

Thermal Baffle - 2 pc

M5 Nut and Washer

2 pcs each

Thermal Baffle

Thermometer

A

(6623S8Y641 ONLY)

 

 

Thermal Baffle

 

B

 

Thermometer

 

 

 

 

(6623S8Y641)

 

Fiber Washer

 

M5 Nuts and Washers

1/4-20 x .39” Bolt

Side View

Step 21

Hood/Hinge Assembly

Place Hood on Bowl and align hinges. Hood hinge legs insert between Bowl hinge legs. Install Hood Hinge Axle through holes in hinge legs, inserting towards the center of the grill. Fasten in place by inserting Axle Pin through small hole in Axle. Repeat for other Hinge.

Hood Hinge Axle 2 pc

Axle Pin

2 pc

Page 19
Image 19
Meco 6623S8E641 manual Step Hood Handle, Thermometer Assembly Model 6623S8Y641 only, Step Hood/Hinge Assembly