FIG. 8B
· Insert Side Burner tube through large hole in Side Burner Pan. Allow threaded stud to go through hole in Electrode bracket while laying the Burner flat. (FIG. 8C) Be sure to fit the Side Burner tube over the Side Burner valve nozzle. (FIG. 8D) Secure Side Burner with M4 Wingnut.
(23) Wingnut, M4
Threaded
Stud
(35) Side Burner Grid
1 pc
FIG. 8A
(32) Side Burner
Electrode 1 pc
(33) Side Burner
1 pc
(23) Wingnut, M4
1 pc

Step 8) Assemble Side Burner Electrode and Side Burner:

·Feed Electrode wire through upper left hole from large center hole in Side Burner Reflector. (FIG. 8A) Allow electrode to follow wire into hole and lie flat. (8B)

Side Burner

Electrode

Electrode Wire through hole

 

 

Side Burner tube

 

 

end fitted over

 

 

valve nozzle

FIG. 8C

FIG. 8D

 

·Attach Electrode Wire end to side terminal of piezo starter under the Control Panel. Be careful not to bend or break terminal. (FIG. 8E)

Piezo Starter

Electrode Wire end to Starter

FIG. 8E

10

Page 10
Image 10
Meco 7900 manual Piezo Starter Electrode Wire end to Starter