·Align prongs of Side Burner Grid with holes in Side Table and lower grid into the holes. (FIG. 8F)

(35)Side Burner Grid

FIG. 8F

Side Table Assembly Finished

FIG. 8G

Step 9) Attach Hood Handle and Shield:

Open Hood. Insert M6 Bolts through Heat Shield, Hood, through large end of Handle Spacers and to the Handle. Tighten bolts into the Handle inserts. Do not over tighten; the porcelain grill coating may crack.

(36) Bolt, M6x75

2 pcs

(37) Hood Heat Shield

1 pc

(38) Handle Spacer

2 pcs

(39)Hood Handle 1 pc

(39)Hood Handle

(38)Handle Spacer

(37)Heat Shield

(36)Bolt, M6x75

FIG. 9

11

Page 11
Image 11
Meco 7900 manual Side Burner Grid Side Table Assembly Finished