FIGURE 11 HOT AIR DUCT CLEARANCE REQUIREMENTS

FIGURE 11 HOT AIR DUCT CLEARANCE REQUIREMENTS

FIGURE 12 PARALLEL ADD-ON INSTALLATION

FIGURE 13 CENTRAL ADD-ON INSTALLATION

 

 

WOODCHUCK FINAL ASSEMBLY

OPTIONAL SHAKER GRATE INSTALLATION FOR MODEL 526

1.Remove standard grates from firebox. Assemble com- plete shaker grate kit outside of unit. Figure 16.

2.Assemble the left front bar (different from right front bar, has shorter extension shaft at front) to a rear bar. Slide a gear onto the front shaft.

3.Set this assembly into the front frame first and then into the rear frame.

20

Page 20
Image 20
Meyer 4000 Woodchuck Final Assembly, Optional Shaker Grate Installation For Model, Hot Air Duct Clearance Requirements