Services
Technical data
Total connected load: see data plate
Plumbing
The steam oven needs to be connected to the mains water supply and to the drainage system by a fully qualified person in accordance with national and local safety regulations.
The machine is constructed to comply with German water regulations (DVGW), and may be connected to a suitable supply without an extra
The plumbing installation must be made in such a way that the stopcock is easily accessible after the appliance has been built in.
The installer is responsible for ensuring that the appliance functions correctly when installed.
The manufacturer cannot accept liability for damage which is a direct or indirect result of incorrect installation or connection.
Electrical connection
See Installation Instruction Booklet before making electrical connection.
All electrical work should be carried out by a suitably qualified and competent person, in strict accordance with current national and local safety regulations
(BS 7671 in the UK).
Installation, repairs and other work by unqualified persons could be dangerous. The manufacturer cannot be held liable for unauthorised work.
Ensure power is not supplied to the appliance until after any installation or repair work has been carried out.
The appliance must only be operated when built in. This is to ensure that all electrical parts are shielded. Live parts must not be exposed.
Important
Refer to the steam oven installation booklet for more information.
The voltage and connected load are given on the data plate. Ensure that these match the household mains supply.
58