Milan Technology MIL-S500 manual Trouble Shooting, Installation

Models: MIL-S500

1 12
Download 12 pages 38.24 Kb
Page 8
Image 8
Installation

 

On

Green

The port is successfully connecting with the

 

device.

 

 

 

 

 

 

 

LINK/ACT Blinking

 

The port is receiving or transmitting data.

Off

The port does not link successfully with the device.

Installation

Apply self-adherent rubber feet to the bottom of the Switch near each of the four corners.

See Figure 6.

6

If applying Switch to metal surface, install magnets as shown in Figure 6. Switch may then be installed on a metal surface.

Plug in power adapter.

Trouble Shooting

8

Page 8
Image 8
Milan Technology MIL-S500 manual Trouble Shooting, Installation