Miller Electric Blue Star 145 manual Grounding Generator When Supplying Building Systems, Oil

Models: 145 DXR, 145 Blue Star 145

1 54
Download 54 pages 11.08 Kb
Page 21
Image 21

. Complete Parts List available at www.MillerWelds.com

5-2. Grounding Generator When Supplying Building Systems

1 2

GND/PE

!

Ground generator to sys-

tem earth ground if supply- ing power to a premises (home, shop, farm) wiring system.

 

1

Equipment Grounding

 

 

Terminal

 

2

Grounding Cable

 

Use #10 AWG or larger insulated

 

copper wire.

 

. Use ground device as stated

2

3

in electrical codes.

 

 

3

Ground Device

800 576-B

5-3. Engine Prestart Checks − Standard Model

1

.Fuel valve is shown in the

open position. Always close fuel valve after stopping unit. Moving unit with fuel valve open may cause carburetor flooding and make starting difficult.

1/2 in

 

(13 mm)

Full

 

Gasoline

 

Full

Check all fluids daily. Engine must be cold and on a level surface. Unit is shipped with 10W30 engine oil.

1Fuel Valve Open valve.

.Close fuel valve before moving

unit or carburetor may flood and make starting difficult.

Fuel

Add fresh fuel before starting engine the first time (see engine manual for specifications). Fill fuel tank up to 1/2 in. (13 mm) from top to allow room for expansion. Check fuel level on a cold engine before use each day.

Oil

After fueling, check oil with unit on level surface. If oil is not up to full mark on dipstick, add oil (see en- gine manual).

Unit stops if oil level is too low. Unit cannot be restarted until sufficient oil is added.

Ref. 803 594-B

OM-4417 Page 17

Page 21
Image 21
Miller Electric Blue Star 145 Grounding Generator When Supplying Building Systems, Engine Prestart Checks − Standard Model