Miller Electric HF-251-2, HF-251D-1 manual Correct Installation, Metal Building Requirements

Models: HF-251-2 HF-251D-1

1 40
Download 40 pages 59.06 Kb
Page 27
Image 27

7-3. Correct Installation

 

Weld Zone

7

3

50 ft

 

 

(15 m)

50 ft

 

 

(15 m)

 

 

5

6

8

1

2

8

4

Ground all metal ob- jects and all wiring in welding zone using #12 AWG wire.

Nonmetal

Building

Ground workpiece if required by codes.

9

1High-Frequency Source (welding power source with built-in HF or separate HF unit)

Ground metal machine case, work output terminal, line disconnect device, input supply, and worktable.

2 Center Point of Welding Zone

Midpoint between high-frequency source and welding torch.

3 Welding Zone

A circle 50 ft (15 m) from center point in all directions.

4 Weld Output Cables

Keep cables short and close together.

Metal Building

8

11

8

 

10

 

 

Ref. S-0695 / Ref. S-0695

5 Conduit Joint Bonding and Grounding

Metal Building Requirements

Electrically join (bond) all conduit sections

9 Metal Building Panel Bonding

using copper straps or braided wire.

Methods

Ground conduit every 50 ft (15 m).

Bolt or weld building panels together, install

6 Water Pipes and Fixtures

copper straps or braided wire across

seams, and ground frame.

 

Ground water pipes every 50 ft (15 m).

10 Windows and Doorways

7

External Power or Telephone Lines

Cover all windows and doorways with

 

 

Locate high-frequency source at least 50 ft

grounded copper screen of not more than

(15 m) away from power and phone lines.

1/4 in (6.4 mm) mesh.

8

Grounding Rod

11 Overhead Door Track

 

Consult the National Electrical Code for

Ground the track.

 

specifications.

 

Return To Table Of Contents

OM-611 Page 23

Page 27
Image 27
Miller Electric HF-251-2, HF-251D-1 manual Correct Installation, Metal Building Requirements