OM-1078 Page 17

SECTION 4 OPERATION

4-1. 115 Volt Model Controls

wfcontrols_1 1/96 / Ref. 144 451-D
1 Run-In Speed Control
Use control to select welding wire
speed before arc initiation. After arc
initiation, the wire feed speed is
controlled by the Wire Speed
control on the gun/feeder.
2 Power Switch
Use switch to turn unit On and Off.
1
2

4-2. Shielding Gas

sb5.1* 6/92 S-0621-C
1 Shielding Gas Cylinder
2 Valve
Open valve on cylinder just before
welding.
Close valve on cylinder when
finished welding.
3 Regulator/Flowmeter
1
2
3

SECTION 5 MAINTENANCE & TROUBLESHOOTING

YDisconnect power
before maintaining. .Maintain more often
during severe conditions.

3 Months

Replace Damaged
Gas Hose
Clean
And
Tighten
Weld
Terminals
Replace
Damaged Or
Unreadable
Labels
Repair Or Replace
Cracked Cables
And Cords

6 Months

Blow Out Or
Vacuum Inside