CLEARANCES and HEIGHT REQUIREMENTS

Heat resistant material (minimum requirements) with no wooden mantel or other combustible projection:

To install the gas logs into a fireplace with no wooden mantel, shelf or other combustible projection above the fireplace opening, measure the heat resistant material height, per Figure 5, then see TABLE A.

Heat resistant materials such as slate and marble must be at least 1/2” thick. Sheet metal should not be installed onto combustible material.

IMPORTANT: If you cannot meet these minimum clearances you must operate the heater with chimney flue damper open. Refer to “Installing Vented Applications” found on page 18.

Heat

Resistant

Material

Measure

this

distance

Heater in

Fireplace or

Firebox

Figure 5 - Measuring Heat Resistant Material

HEAT RESISTANT

REQUIREMENTS FOR SAFE INSTALLATION

MATERIAL

 

 

 

TBP18

TBP24

TBP30

MEASUREMENT

 

 

 

12" or more

Hood not required.

Hood not required.

Hood not required.

8" to less than 12"

Hood not required.

Extend heat resistant material

Extend heat resistant material

 

 

to 12" OR install hood. See

to 12" OR install hood. See

 

 

Figure 5.

Figure 5.

Less than 8"

Extend heat resistant material

Extend heat resistant material

Extend heat resistant material

 

to 8" AND install hood. See

to 8" AND install hood. See

to 8" AND install hood. See

 

Figure 5.

Figure 5. OR, extend heat

Figure 5. OR, extend heat

 

 

resistant material to a height of

resistant material to a height

 

 

at least 12".

of at least 12".

TABLE A - Heat Resistant Material Requirements with no Mantel or Combustible Projection