147
Figure 80 - Lower Grounding Configuration
The Andrew Grounding Kit at the ODU is optional providing a Surge Arrestor Unit is located at
the ODU and is reliably grounded. However, it may be a regulatory requirement to cross-
bond the screened CAT-5 at regular intervals up the mast. Refer to local regulatory
requirements for further details.