151
11.3 Testing Your Installation If you have followed the above instructions you will have wired your system to the following
diagram:
Ethernet
1 Orange/White
3 Green/White
6 Green
8 Brown
4 Blue
5 Blue/White
7 Brown/White
2 Orange
Ethernet
Ethernet
LED/Reset
signalling
0V Floating
36V-55V
Chassis
1 Orange/White
3 Green/White
6 Green
8 Brown
4 Blue
5 Blue/White
7 Brown/White
2 Orange
Ethernet
LED/Reset
signalling
0V Floating
36V-55V
PIDU Plus ODU
Surge Arrestor
ALPU-ORT
Cable Screen
Tower
T-568B T-568B
CON3 CON4
CON1 CON2
1
2
3
6
4
5
7
8
3
5
2
4
8
1
6
7
Figure 82 - Simplified Circuit Diagram (Only One Transtector Shown For Clarity)
11.3.1 Pre-Power Testing
Before plugging in the RJ45 to the PIDU Plus, check the following impedances at the RJ45:
1. Check the cable resistance between pins 7 and 4 at the RJ45. Check against column 2 in
the Table 18.
2. Check the resistance between pins 8 and 5 at the RJ45. Check against column 3 in the
Table 18.
3. Check the resistance between pins 7 and 8 at the RJ45. The value should be greater
than 1000 ohms.