Moyer Diebel MD18-1, MD18-2 Maintenance, Cleaning Schedule, Daily-Every 8 Hours, Use Periods

Models: MD18-2 MD18-1

1 44
Download 44 pages 28 Kb
Page 16
Image 16
MAINTENANCE

MAINTENANCE

MAINTENANCE

The efficiency and life of your machine is increased by regularly scheduled preventive maintenance. A well maintained machine gives better results and service. An investment of a few minutes of daily maintenance will be worthwhile.

The best maintenance you can provide is to keep your machine clean. Components that are not regularly cleaned and flushed will clog and become inoperative.

Intervals shown in the following schedules represent an average length of time between necessary maintenance. Maintenance intervals should be shortened whenever your machine is faced with abnormal working conditions, hard water, or multiple shift operations.

Cleaning Schedule

Daily-Every 8 Hours

1.Depress the OFF/DRAIN switch to OFF and close the door. Push cycle switch to drain the tank.

2.Open the door and remove both the upper and lower spray arms by unscrewing the knurled fastener holding each spray arm.

3.Remove the scrap basket carefully to keep soil or waste particles from falling into the sump.

4.Clean inside the tank with clean water. Backflush the scrap basket until it is clean. Do not strike the scrap basket against solid objects.

5.Clean the wash arms to remove any debris from spray openings. Do not strike the spray arms against solid objects.

6.Reinstall the scrap basket and spray arms.

7.Leave the door open overnight to allow drying.

8.Report any unusual conditions to your supervisor.

Use Periods

1.Clean the scrap basket after every use period and more frequently during heavy usage. Do not allow the scrap basket to become clogged with soil or waste particles.

10

Page 16
Image 16
Moyer Diebel MD18-1, MD18-2 technical manual Maintenance, Cleaning Schedule, Daily-Every 8 Hours, Use Periods