Moyer Diebel MD18-1, MD18-2 technical manual Maintenance Schedule, As Required, Weekly

Models: MD18-2 MD18-1

1 44
Download 44 pages 28 Kb
Page 18
Image 18
Maintenance Schedule

MAINTENANCE

Maintenance Schedule

As Required

1.Check the temperature gauge reading.

2.Check the chemical supplies and refill as necessary.

Weekly

1.Inspect all water lines for leaks and tighten them at joints if required.

2.Clean all detergent residue from the exterior of the machine.

3.Check the drain for leaks.

4.Clean accumulated scale from the heating element.

5.Remove and closely inspect each spray arm for blockage.

6.Check for damage to the scrap screen. Ineffective screening can cause wash system failures.

7.Flush the detergent, sanitizer, and rinse aid supply tubes by the following procedure:

a.Remove the detergent, sanitizer, and rinse aid pick-up tube(s) from the container(s). Place the tube(s) into a container of hot water.

b.Depress and hold the DET prime switch (located on the front panel) until clear water enters the tank through the fill air gap (located on the side of the tank).

c.Follow the same procedure by pressing the SANITIZER and/or the RINSE AID prime switch until clear water enters the tank through the fill air gap.

d.When completed, remove the pickup tubes from the hot water and reinsert them into the correct chemical containers. Repeat the priming procedures to ensure that chemicals have filled the tubes for the next operating period.

e.Run a complete cycle to flush chemicals from the tank.

12

Page 18
Image 18
Moyer Diebel MD18-1, MD18-2 technical manual Maintenance Schedule, As Required, Weekly