MTD OEM-190-180A, 19A30002000 manual

Models: 19A30002000 OEM-190-180A

1 52
Download 52 pages 27.6 Kb
Page 14
Image 14
9.Install the rubber chute strap on the chute elbow using the supplied clevis pin, washer and Bow-tie cotter pin. See Fig. 4-19.

7.Open Hood by pushing in on the rear, right-side tab with your right hand, as seen in 1 of Fig. 4-17, and lifting the cover with your left hand in the center rear of the bagger cover, 2.

2

1

Figure 4-17

8.Install both bag assemblies with the tight mesh sides facing forward, onto the bag support brackets by inserting the front edge in first, as seen in Fig. 4-18, and setting the back edge down until it fits into the assembly.

Manual background1 Manual backgroundManual background

2

Figure 4-18

9.Install the rubber chute strap on the chute elbow using the supplied clevis pin, washer and Bow-tie cotter pin. See Fig. 4-19.

10.Install the ball pin from your hardware pack into the hole in the front of the mower deck as seen in Fig. 4-20, and secure with the supplied flange lock nut.

11.With the tractor’s discharge chute raised up and held open, install the chute elbow over the chute opening by placing the top, rear edge of the chute elbow over the rear of the deck opening, then pivoting the chute elbow down and over the chute opening. See Fig. 4-21.

Figure 4-19

Figure 4-20

Figure 4-21

14

Section 4 — Assembly & Installation

Page 14
Image 14
MTD OEM-190-180A, 19A30002000 manual