Napoleon Fireplaces GD70NT-S Finishing, Door Installation, Gdlv Louvre Installation, Hinge Screen

Models: GD70PT-S GD70NT-S

1 28
Download 28 pages 19.04 Kb
Page 16
Image 16
FINISHING

16

FINISHING

DOOR INSTALLATION

GDLV LOUVRE INSTALLATION

Loosely thread a screw provided with the door kit into the top hole on the left side of the firebox. Hang the door by the hinge onto the screw. Insert the remaining 4 screws and tighten.

IMPORTANT: Ensure screws are driven in straight or the hole thread may be damaged.

FIGURE38

Remove the pro- tective plastic wrap from the louvres and install as illus- trated.

Clip each upper louvre into a slot on the louvre bracket. Ensure that the louvres are cen- tered within the opening.

LOUVRE

BRACKET

FIGURE40

UPPER LOUVRE INSTALLATION

DOOR CLOSING AND OPENING

Open the valve control door.

FIGURE39

Hook the top and bottom door

 

 

latches, located at the right

 

side of the door into the corre-

 

sponding slots in the door.

 

The door latch holes are elongated for door levelling. To level the door, it may need to be lifted up at the right side before latching to ensure the door is level.

Prior to opening the door, lift up and remove the upper lou- vres or ornamental insets.

HINGE SCREENDOOR INSTALLATION

Remove the hinge screen, if factory installed.

FIGURE41

HINGE

SCREEN

FIGURE 42: LOWER LOUVREASSEMBLY

Screw the lower louvre assembly to the lip of the fireplace base as shown. Position the hinge screen into place and with the control door open, secure to the firebox using three screws.

W415-0434 / C / 03.24.05

Page 16
Image 16
Napoleon Fireplaces GD70NT-S, GD70PT-S Finishing, Door Installation, Gdlv Louvre Installation, Door Closing And Opening