Napoleon Fireplaces NPS40, NPI40 manual Venting The Pellet Heater, Pellet Vent Termination

Models: NPS40 NPI40

1 44
Download 44 pages 1.92 Kb
Page 13
Image 13
VENTING THE PELLET HEATER

13

VENTING THE PELLET HEATER

Use an approved wall thimble when passing the vent through walls and a ceiling support/fi re stop spacer when passing the vent through ceilings (maintain a 3" clearance to any combustibles).

PELLET VENT TERMINATION

The vent termination must have an approved cap (to prevent water from entering) or a 45° downturn.

If the termination is located on a windy side of the house, a shield is recommended to prevent soot from building up on the side of the house.

Horizontal terminations must protrude 12" from the wall, vertical terminations require a minimum 24" above the highest point that it penetrates through the roof.

Depending on pellet quality, vent confi guration and air settings, black soot may occur on the terminal wall.

ALCOVE INSTALLATION (NPS40 ONLY)

Figure 7

Minimum Alcove Dimensions

W415-0616 / C / 06.04.08

Page 13
Image 13
Napoleon Fireplaces NPI40 manual Venting The Pellet Heater, Pellet Vent Termination, ALCOVE INSTALLATION NPS40 ONLY