MINIMUM ENCLOSURE CLEARANCES

24

MINIMUM ENCLOSURE CLEARANCES

Figure 25

NPI40 FINISHING

FLASHING INSTALLATION

1.Secure the Right Flashing to the right side of the unit using two of the #8 x 1/2" screws.

FIGURE 26 NPI40 FINISHING

NOTE: Feed the Air Control Rod into the Air Control Slot on the Right Flashing before securing. (FIGURE 26)

2.

Twist spring handle (supplied with

 

the heater) onto the air control rod

 

until it hits the stop.

3.

Remove the two control panel

 

securing screws, discard the screws

 

and shipping bracket. (FIGURE 27)

4.

Secure the control panel to the Right

 

Flashing using the two #8 x 3/8" screws.

AIR

CONTROL

ROD

AIR

CONTROL

SLOT

L

 

O

1

W

2

3 4

SHIPPING

CONTROL

BRACKET

PANEL

SECURING

SECURING

SCREWS

SCREWS

FIGURE 27

CONTROL

PANEL

RIGHT

FLASHING

5 IH G H

FLASHING INSTALLATION BURN

RATE LABEL

(FIGURE 20) Secure the Left Flashing

with the remaining #8 x 1/2" screws.

(FIGURE 26)

5. Align the holes in the top of the Right and

Left Flashing with those on the bottom lip

of the Top Flashing and secure from the

rear using the four #8-32 x 3/8" screws,

washers and nuts. (FIGURE 29)

FIGURE 28

FIGURE 29

TOP

FLASHING

6.The three pieces of trim are assembled in

the same manner as a picture frame. Place the corner brackets (with screw loosened) into the trim sections. Tighten the screw spreading the two pieces apart. Attach the adjoining section. Repeat with the opposite side. Tighten all screws fi rmly.

(FIGURE 30)

7.Slide the assembled trim down over the fl ashing.

(FIGURE 31)

FIGURE 30

FIGURE 31

TRIM

ASSEMBLY

8.Affi x the logo to the bottom left hand corner of the left fl ashing.

W415-0616 / C / 06.04.08

Page 24
Image 24
Napoleon Fireplaces NPS40 manual NPI40 FINISHING, Minimum Enclosure Clearances, Flashing Installation