New Buck Corporation 81 installation instructions Final Check

Models: 81

1 39
Download 39 pages 45.25 Kb
Page 22
Image 22
FINAL CHECK

FINAL CHECK

1.Recheck specified clearances.

2.Remove all foreign material from firebox area.

3.Open primary air draft.

NOTE: Plug power cord into a 115V AC outlet. Set switch to “Manual” and rheostat to “High” position to ensure motor operates properly. Route cord to prevent damage to cord insulation from heat and sharp objects. Keep cord out of way of traffic toprevent damage caused by tripping, etc.

4.Place crumpled pieces of newspaper in stove. Light it and close door. Ensure that stove draws properly through primary draft.

5.Check for smoke leaks around door.

If a thorough review of the Troubleshooting Guide in rear of manual does not reveal problem, contact your dealer for assistance.

Page 20

Page 22
Image 22
New Buck Corporation 81 installation instructions Final Check