New Buck Corporation 81 installation instructions Final Check

Models: 81

1 39
Download 39 pages 45.25 Kb
Page 30
Image 30
Manual background

(a)Chimney pipe is 3' higher than roof at point where it penetrates roof.

(b)Chimney pipe height is at least 2' higher than any part of roof within 10' of chimney. (See Page 27, Figure 12).

4.Next, install a New Buck Corporation chimney connector to flue of heater or use 3 “Ell” brackets and secure to top of heater and pipe.

5.Using single wall chimney connector, connect heater to chimney by following manufac- turer’s installation instructions exactly. (See Figure 13).

CEILING SUPPORT BOX

CHIMNEY CONNECTOR

SINGLE WALL PIPE

 

Figure 13

FINAL CHECK

1.Recheck specified clearances.

2.Remove all foreign material from firebox area.

3.Open primary air draft.

NOTE: Plug power cord into a 115V AC outlet. Set switch to “Manual” and rheostat to “High” position to ensure motor operates properly. Route cord to prevent damage to cord insulation from heat and sharp objects. Keep cord out of way of traffic to prevent damage caused by tripping, etc.

Page 28

Page 30
Image 30
New Buck Corporation 81 installation instructions Final Check