New Buck Corporation DV23ZC manual Installation, General Information

Models: DV23ZC

1 33
Download 33 pages 10.86 Kb
Page 10
Image 10
GENERAL INFORMATION

INSTALLATION

GENERAL INFORMATION

Remove the shipping carton. Make sure the unit is not damaged. Lift the top louver and remove three (3) nuts at the upper left, right, and center of the glass frame. Also, open louver at bottom and remove the three (3) nuts. Set the door aside and protect from inadvertent damage. Retain nuts for reassembly. Next, carefully remove the box of logs inside the appliance and set these aside.

1.Framing - Maintain dimensions for the appliance enclosure as illustrated in Figure 1.

2.Gas Supply - These units are equipped with pipe supply access holes at the right side and right rear facing unit.

3.Position appliance into framing - DO NOT secure with nails at the nailing tabs at top front corners until venting installation is complete.

4.Vent system — NOTE: (The Model No. DV23ZC must be vented using the Simpson-Dura- Vent Direct Vent Gas 4" inside 6" venting system.) All warranties will be voided and serious fire, health, or other safety hazards may result from any of the following actions: Installation of any damaged components not manufactured or approved by Simpson-Dura- Vent; failure to meet all clearance requirements; failure to properly twist-lock and seal all components.

Each section of Dura-Vent-GS flue system must be properly sealed to prevent the possibility of leakage. This is accomplished by using high temperature silicone sealant. Apply a bead of sealant around the bell section of the inner pipe prior to joining the pieces together. The outer pipe joint may be sealed with metal foil tape or with silicone sealant.

5.Remote Wall Switch or Thermostat or Remote Control - This appliance can be switched on or off using one of several devices: 1). Appliance ON/OFF switch, 2) Wall Mounted Remote Wall Switch, 3) Remote Wall Thermostat, or 4) Wireless Remote Control.

6.Connecting gas line — make gas line connections. All codes require a shut-off valve mounted in the supply line. See Figure 15.

The flex line method is acceptable in the United States. However, Canadian requirements vary depending upon locality. Installation must be in compliance with local codes.

8

Page 10
Image 10
New Buck Corporation DV23ZC manual Installation, General Information