3-3SectionInstalling the SRM1

20

Accessibility Ensure that the SRM1 can be accessed for normal operation and maintenance.
Provide a clear path to the SRM1 for operation and maintenance. High-voltage
equipment or power lines could be dangerous if they are in the way during rou-
tine operations.
The SRM1 will be easiest to access if the panel or cabinet is installed about 3 to
5 feet off of the floor.
3-3 Installing the SRM1
The SRM1 can be installed on a horizontal surface or on a DIN track.

3-3-1 Surface Installation

Use the following pattern when installing an SRM1 on a horizontal surface.
Two M4 or two 4.2 dia.
(Unit: mm, with tolerance of ±0.2 mm)
30
100

3-3-2 DIN Track Installation

The SRM1 can be installed on a 35-mm DIN track.
End Plates
(PFP-M)
DIN Track
PFP-100N (1 m)
PFP-50N (50 cm)