11.3. Outdoor Unit

11.3.1. Install the Outdoor Unit

After selecting the best location, start installation according to Indoor/Outdoor Unit Installation Diagram.
1. Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø10 mm).
2. When installing at roof, please consider strong wind and earthquake. Please fasten the installation stand firmly with bolt or
nails.

11.3.2. Connect the Piping

Connecting the Piping to Indoor
Please make flare after inserting flare nut (locate at joint portion
of tube assembly) onto the copper pipe.
(In case of using long piping)
Connect the piping
Align the center of piping and sufficiently tighten the flare nut
with fingers.
Further tighten the flare nut with torque wrench in specified
torque as stated in the table.
Connecting the Piping to Outdoor
Decide piping length and then cut by using pipe cutter. Remove
burrs from cut edge. Make flare after inserting the flare nut
(located at valve) onto the copper pipe.
Align center of piping to valve and then tighten with torque
wrench to the specified torque as stated in the table.

11.3.3. Evacuation of the Equipment

WHEN INSTALLING AN AIR CONDITIONER, BE SURE TO EVACUATE THE AIR INSIDE THE INDOOR UNIT AND PIPES in the
following procedure.
1. Connect a charging hose with a push pin to the Low side of a charging set and the service port of the 3-way valve.
Be sure to connect the end of the charging hose with the push pin to the service port.
2. Connect the center hose of the charging set to a vacuum pump.
3. Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from 0 cmHg (0 MPa) to
-76 cmHg (-0.1 MPa). Then evacuate the air approximately ten minutes.
Model A B C D
CE9*** 570 mm 105 mm 18.5 mm 320 mm
CE12***
Do not over tighten, over tightening cause gas leakage.
Piping Size Torque
1/4” (6.35 mm) [18 Nm (1.8 kgf.m)]
3/8” (9.52 mm) [42 Nm (4.3 kgf.m)]
1/2” (12.7 mm) [55 Nm (5.6 kgf.m)]
5/8” (15.88 mm) [65 Nm (6.6 kgf.m)]
3/4” (19.05 mm) [100 Nm (10.2 kgf.m)]