3.Select Done.
4.Press EXIT to return to previous screen.
Run the Schedule
After the schedule times have been set (per above instructions), you will use the Run Schedule function whenever you want the schedule to take effect.
There are two methods for running the schedule, either from a slideshow or from the CALENDAR/CLOCK screen.
CAUTION: After you select the Run Schedule function, any user intervention will cancel the activation (i.e., pressing remote or control button, powering off) and the schedule will not take effect until you select this function again to
Run Schedule from Slideshow
1.Start a slideshow, and then press ENTER when the Run Schedule button appears (approx 10 seconds). A small timer clock will appear indicating the schedule is active. To run the schedule when the Run Schedule button is no longer displayed, restart your slideshow and then press ENTER when the Run Schedule button appears again.
2.The DPF will go into
Run Schedule from CALENDAR/CLOCK Screen
1.On the CALENDAR/CLOCK screen, press MENU.
2.Select Run Schedule. A small timer clock will appear indicating the schedule is active, and then the DPF will operate according to the set schedule.
3.The DPF will go into
21