3/8 X 3-3/4” 30

24

 

 

1

 

43

 

42

 

34

31 3/8 X 8”

 

36

 

44

 

 

9

 

27

FIGURE 14

12

STEP 14:

Refer to cable ILLUSTRATION “A” on page 11 for cable routing while installing pulleys.

Assemble one 3-1/2” PULLEY (24) into the PRIMARY PIVOT (9) lower hole using one 3/8 X 8” BOLT (31),

two 3/8” FLAT WASHERS (36), two 3/8 X 1-3/16” SPACERS (44) and one 3/8” LOCK NUT (34) and tighten securely.

Assemble one 3-1/2” PULLEY (24) to the FRAME (1) using one 3/8 X 3-3/4” BOLT (30), two 3/8 X 1-1/16” FLANGE SPACERS (42), one 3/8” LOCK NUT (34) and tighten securely

Loosely assemble one 3-1/2” PULLEY (24) between PULLEY PLATES (12) using one 3/8 X 1-3/4” BOLT (27) and one 3/8” LOCK NUT (34).

Assemble two 3-1/2” PULLEYS (24) between the left and right BOOM PLATES (4) and (5) using two 3/8 X 3-3/4” BOLTS (30), four 3/8 X 1” SPACERS (43) and two 3/8” LOCK NUTS (34)

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

 

0

 

 

1

 

 

2

 

 

3

 

 

4

 

 

5

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16

Page 16
Image 16
ParaBody 220 manual X 3-3/4 31 3/8 X