STEP 17

Screw one of the threaded ends of the previously removed HEAD PLATE CABLE approximately 1” into the end of the WEIGHT STACK SHAFT. See FIGURE17.

STEP 18

Route the thread end of HEAD PLATE CABLE up and over the PULLEYS in the TOP BOOM above the WEIGHT STACK. (Remove pulleys for ease of installation.)

Screw the other threaded end of the HEAD PLATE CABLE approximately 1” into the end of the shaft on the D-RING. See FIGURE 18.

FIGURE 17

HEAD PLATE

CABLE

(67250)

WEIGHT STACK

SHAFT

SECURELY tighten the pulleys connection from the previous step.

Adjust out any slack in the two cable systems. (Refer to your 425104 instructions for the proper procedures.)

FIGURE 18

HEAD PLATE CABLE

(67250)

D-RING

13

Page 13
Image 13
ParaBody 445104 manual Head Plate Cable