43 1/2 X 4-1/2”

16

9

SAFTEY

STOP

8

FIGURE 8

STEP 8:

Remove the two temporary 1/2 X 4-1/2” BOLTS (43) from STEP 5.

Swing the LEFT (8) and RIGHT (9) RAILS out enough to insert the CARRIAGE ASSEMBLY (16) in between them. Allow the CARRIAGE (16) to rest on the SAFETY STOPS underneath the RAILS. See FIGURE 8.

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

12

Page 12
Image 12
ParaBody Hip Sled System manual Saftey