Installation

2-6 3166-A2-GB20-10

November 1998

The power-up self-test begins when power is applied. During the power-up

self-test, the Fail LED flashes, then all LEDs blink twice. When the test is

complete, verify that the DSU/CSU is functional by observing that the OK and

NET Sig LEDs are lit.

98-16081
NET
DSU/CSU
3166
Port1
OK
Fail
Test
Sig
OOF
Alrm
EER
DTR
TXD
RXD
CTS
RTS
Select
In
Out
Net
Mon