WHAT TO DO IF YOU SMELL GAS
Installation Operation & Maintenance Manual
Peerless Pinnacle
Stainless Steel Gas Boilers
TABLE OF CONTENTS
TABLE OF CONTENTS
A.INSTALLATION SEQUENCE
USING THIS MANUAL
USING THIS MANUAL
DANGER
DANGER
1. PREINSTALLATION
PREINSTALLATION
C. ACCESSIBILITY CLEARANCES
This boiler is certified as an indoor appliance. Do not install this boiler outdoors or locate where it will be exposed to freezing temperatures
PREINSTALLATION
B.WALL HUNG BOILERS
2. BOILER SET-UP
BOILER SET-UP
A.GENERAL
B.OPERATING PARAMETERS
3. WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
A.GENERAL
Boiler
Figure 3.1 Piping Symbol Key
WATER PIPING AND CONTROLS
Table 3.2 - Boiler Inputs and Outputs
Table 3.3 - Flow Rate and Pressure Drop
WATER PIPING AND CONTROLS
Figure 3.2 Pinnacle Circulator Sizing Graph
WATER PIPING AND CONTROLS
D. SYSTEM PIPING
E. FREEZE PROTECTION
WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
F.SPECIAL APPLICATIONS
WATER PIPING AND CONTROLS
Figure 3.8 Boiler in conjunction with a Chilled Water System
WATER PIPING AND CONTROLS
A . GENERAL
4. GAS PIPING
GAS PIPING
C.GAS SUPPLY PIPING INSTALLATION
Figure 4.2 PI-80/PI-140/PI-199
GAS PIPING
D.GAS SUPPLY PIPING - OPERATION
Figure 4.1 Gas Supply Piping - Sediment Trap
E. MAIN GAS VALVE - OPERATION
GAS PIPING
C.EXHAUST VENT / AIR INTAKE PIPE LOCATION
VENTING, INLET AIR AND CONDENSATE
5. VENTING, INLET AIR AND CONDENSATE
A.GENERAL
Table 5.1 Fitting Equivalent Length Table
VENTING, INLET AIR AND CONDENSATE
D.EXHAUST VENT AND INTAKE AIR PIPE SIZING
Figure 5.2 Multiple Pinnacle Vent Spacing
VENTING, INLET AIR AND CONDENSATE
E.EXHAUST VENT AND AIR INTAKE PIPE INSTALLATION
Figure 5.3 PI-80, PI-140,and PI-199Sidewall
VENTING, INLET AIR AND CONDENSATE
Figure 5.7 PI-80, PI-140, PI-199Sidewall Venting with 3 Pipe 3 Vent Kit
VENTING, INLET AIR AND CONDENSATE
Venting with 3 Pipe
VENTING, INLET AIR AND CONDENSATE
Figure 5.11 PI-80, PI-140, PI-199Vertical
Figure 5.13 PI-80, PI-140, PI-199Vertical
H.BOILER REMOVAL FROM COMMON VENTING SYSTEM
G.CONDENSATE DRAIN INSTALLATION
VENTING, INLET AIR AND CONDENSATE
F.EXHAUST TAPPING FOR VENT SAMPLE
B.SEQUENCE OF OPERATION
6. ELECTRICAL
ELECTRICAL
A.WIRING
ELECTRICAL
Figure 6.3 Boiler Control Board Wiring Schematic
Table 6.1 Program Functions
C.SAFETY INTERLOCKS
ELECTRICAL
D.CONTROL FUNCTIONS
Status
Table 6.4 Installer Menu
ELECTRICAL
Table 6.3 Status Menu
A.COMPLETING THE INSTALLATION
7. START-UPPROCEDURES
START-UPPROCEDURES
OPERATING INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE OPERATING
START-UPPROCEDURES
B.LIGHTING AND OPERATING PROCEDURES
C.CHECK-OUTPROCEDURE
START-UPPROCEDURES
B. BOILER FAULT
8. TROUBLESHOOTING
TROUBLESHOOTING
A. BOILER ERROR
Description
TROUBLESHOOTING
Fault
Code
A.GENERAL WITH BOILER IN USE
9. MAINTENANCE
MAINTENANCE
DANGER
GAS LEAKS
MAINTENANCE
DANGER
SURE EXHAUST VENT IS NO LONGER BLOCKED
SURE EXHAUST VENT IS NO LONGER BLOCKED
MAINTENANCE
DANGER
A. BOILER DIMENSIONS
10. BOILER DIMENSIONS & RATINGS
BOILER DIMENSIONS & RATINGS
Figure 10.2: PI-80/PI-140/PI-199Dimensions
BOILER DIMENSIONS & RATINGS
Table 10.1 Boiler Ratings
BOILER DIMENSIONS & RATINGS
REPAIR PARTS
11. REPAIR PARTS
REPAIR PARTS
B.P125 CONTROL BOARD QUICK REFERENCE
WHAT’S NEW WITH THE P125 CONTROL BOARD
A.ADVANTAGES OF THE P125 CONTROL BOARD
WHAT’S NEW WITH THE P125 CONTROL BOARD
Peerless Pinnacle
Installation Operation & Maintenance Manual
TO THE INSTALLER
Qualified Service Agency