Peerless Pinnacle
Installation Operation & Maintenance Manual
Stainless Steel Gas Boilers
WHAT TO DO IF YOU SMELL GAS
TABLE OF CONTENTS
TABLE OF CONTENTS
USING THIS MANUAL
USING THIS MANUAL
DANGER
A.INSTALLATION SEQUENCE
PREINSTALLATION
1. PREINSTALLATION
C. ACCESSIBILITY CLEARANCES
DANGER
This boiler is certified as an indoor appliance. Do not install this boiler outdoors or locate where it will be exposed to freezing temperatures
PREINSTALLATION
BOILER SET-UP
2. BOILER SET-UP
A.GENERAL
B.WALL HUNG BOILERS
WATER PIPING AND CONTROLS
3. WATER PIPING AND CONTROLS
A.GENERAL
B.OPERATING PARAMETERS
WATER PIPING AND CONTROLS
Figure 3.1 Piping Symbol Key
Table 3.2 - Boiler Inputs and Outputs
Boiler
Table 3.3 - Flow Rate and Pressure Drop
WATER PIPING AND CONTROLS
D. SYSTEM PIPING
WATER PIPING AND CONTROLS
E. FREEZE PROTECTION
Figure 3.2 Pinnacle Circulator Sizing Graph
WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
F.SPECIAL APPLICATIONS
WATER PIPING AND CONTROLS
Figure 3.8 Boiler in conjunction with a Chilled Water System
WATER PIPING AND CONTROLS
GAS PIPING
4. GAS PIPING
C.GAS SUPPLY PIPING INSTALLATION
A . GENERAL
D.GAS SUPPLY PIPING - OPERATION
GAS PIPING
Figure 4.1 Gas Supply Piping - Sediment Trap
Figure 4.2 PI-80/PI-140/PI-199
E. MAIN GAS VALVE - OPERATION
GAS PIPING
5. VENTING, INLET AIR AND CONDENSATE
VENTING, INLET AIR AND CONDENSATE
A.GENERAL
C.EXHAUST VENT / AIR INTAKE PIPE LOCATION
D.EXHAUST VENT AND INTAKE AIR PIPE SIZING
VENTING, INLET AIR AND CONDENSATE
Figure 5.2 Multiple Pinnacle Vent Spacing
Table 5.1 Fitting Equivalent Length Table
VENTING, INLET AIR AND CONDENSATE
E.EXHAUST VENT AND AIR INTAKE PIPE INSTALLATION
Figure 5.3 PI-80, PI-140,and PI-199Sidewall
VENTING, INLET AIR AND CONDENSATE
Figure 5.7 PI-80, PI-140, PI-199Sidewall Venting with 3 Pipe 3 Vent Kit
VENTING, INLET AIR AND CONDENSATE
Figure 5.11 PI-80, PI-140, PI-199Vertical
VENTING, INLET AIR AND CONDENSATE
Figure 5.13 PI-80, PI-140, PI-199Vertical
Venting with 3 Pipe
VENTING, INLET AIR AND CONDENSATE
G.CONDENSATE DRAIN INSTALLATION
F.EXHAUST TAPPING FOR VENT SAMPLE
H.BOILER REMOVAL FROM COMMON VENTING SYSTEM
ELECTRICAL
6. ELECTRICAL
A.WIRING
B.SEQUENCE OF OPERATION
ELECTRICAL
Figure 6.3 Boiler Control Board Wiring Schematic
ELECTRICAL
C.SAFETY INTERLOCKS
D.CONTROL FUNCTIONS
Table 6.1 Program Functions
ELECTRICAL
Table 6.4 Installer Menu
Table 6.3 Status Menu
Status
A.COMPLETING THE INSTALLATION
7. START-UPPROCEDURES
START-UPPROCEDURES
START-UPPROCEDURES
FOR YOUR SAFETY READ BEFORE OPERATING
B.LIGHTING AND OPERATING PROCEDURES
OPERATING INSTRUCTIONS
C.CHECK-OUTPROCEDURE
START-UPPROCEDURES
TROUBLESHOOTING
8. TROUBLESHOOTING
A. BOILER ERROR
B. BOILER FAULT
Fault
TROUBLESHOOTING
Code
Description
MAINTENANCE
9. MAINTENANCE
DANGER
A.GENERAL WITH BOILER IN USE
DANGER
MAINTENANCE
SURE EXHAUST VENT IS NO LONGER BLOCKED
GAS LEAKS
SURE EXHAUST VENT IS NO LONGER BLOCKED
MAINTENANCE
DANGER
A. BOILER DIMENSIONS
10. BOILER DIMENSIONS & RATINGS
BOILER DIMENSIONS & RATINGS
Figure 10.2: PI-80/PI-140/PI-199Dimensions
BOILER DIMENSIONS & RATINGS
Table 10.1 Boiler Ratings
BOILER DIMENSIONS & RATINGS
REPAIR PARTS
11. REPAIR PARTS
REPAIR PARTS
B.P125 CONTROL BOARD QUICK REFERENCE
WHAT’S NEW WITH THE P125 CONTROL BOARD
A.ADVANTAGES OF THE P125 CONTROL BOARD
WHAT’S NEW WITH THE P125 CONTROL BOARD
TO THE INSTALLER
Installation Operation & Maintenance Manual
Qualified Service Agency
Peerless Pinnacle