Great Plains Mfg., Inc.
Installation Instructions 3
Drive Assembly
605NT and 3P605NT Drive
NOTE: If your drill is equipped with a native grass option, a majority of the agitator drive is already installed. Go to page 4 for chain routing.
See Figure 3:
1.Mount bearings and flanges (1) to left side of drill frame and to the frame support as shown. Use 5/16 x 1 inch bolts (2), washers and nuts to secure flanges. Leave bolts loose.
2.Install drive shaft (3) through bearings. As you install shaft, place 17 tooth sprocket (4) on shaft near left side of drill frame.
3.Place 17 tooth sprocket (5) on the right end of shaft.
4.Install three 12 tooth idler sprockets (6) in lo- cations shown, using a 1/2 x
and hex flange nuts (10).
18662
Figure 3
605NT & 3P605NT Drive Assembly
3/31/2004 |