iii
Declaration of Conformity
We declare, under our sole responsibility, that the product identified in this declaration, and to which this declaration relates, are in conformity with the protection requirements of Council Directive 89/ 336/EEC and standards IP33
•Standard
•Standard
•Standard EN
Manufacturer: | Pentair Water Pool and Spa, Inc. |
| 1620 Hawkins Ave, Sanford, NC 27330 |
| 10951 West Los Angeles Ave, Moorpark, CA 93021 |
Installation Steps Summary
The recommended Power Center installation steps are:
1Review Important Safety Precautions (page ii and 2): Review this important information.
2Review Power Center Overview (page 1): Review the Power Center overview information.
3Installing the IntelliChlor Power Center (page 2 ): Installation information.
4Operating Instructions (page 2): Operating information.
Technical Support
Contact Technical Support at:
Sanford, North Carolina (8 A.M. to 5 P.M.)
Phone: (800)
Fax: (919)
Moorpark, California (8 A.M. to 5 P.M.)
Phone: (800)
Fax: (805)
Web sites
visit www.pentairpool.com and www.staritepool.com
IntelliChlor Power Center Installation Guide