C O M M E R C I A L P R O D U C T S D I V I S I O N

Diagram 5

Route the cable.

 

Display cable

 

Right side

 

mounting

 

bracket

 

Route cable

 

through hole.

 

Right side

 

upright support

6.Route the display cable. Diagram 5. Unwrap the cable and remove any kinks. Have an assistant hold the right upright support close to the base while you route the cable through it.

Note: Attaching a string to the cable with a washer tied to the opposite end of the string may help you route the cable through the upright support.

Diagram 6

Attach the

1

 

upright supports.

Display cable Right side

upright support

Left side upright support (Step 8)

Upright support Attach this right side support first.

Front panel

¾-inch screws (C)

with washers (D)

2-inch screws (A), washers (D), barrel spacers (B)

2

3

7.Attach the right side upright support to the base assembly. Diagram 6, #1. Take the following steps to align the right side upright support with the base assembly mounts while your assistant keeps tension on the cable:

Important: Do not securely tighten the screws until after the unit has been fully assembled. Make sure that the bolt and spacer do not pinch the cable.

a.Place a washer (D) onto each of two ¾-inch screws (C). Thread the screws through the front panel and into the upright support. Leave room for adjust- ments.

b.Place a washer (D) and barrel spacer (B) on each of two 2-inch screws (A). See Diagram 6, #3. Insert the screws through the upright support and thread them into the base mounts.

page 13

Page 13
Image 13
Precor C934 owner manual Route cable