Manuals
/
Pride Mobility
/
Personal Care
/
Mobility Aid
Pride Mobility
400
manual
Commander
Models:
400
1
1
20
20
Download
20 pages
35.83 Kb
1
2
3
4
5
6
7
8
Troubleshooting
Install
Product Safety Symbols
Commander
BOOM-ARM Adjustment
Power Switch Operation
Page 1
Image 1
COMMANDER 400
Page 1
Page 2
Page 1
Image 1
Page 1
Page 2
Contents
Commander
F E T Y G U I D E L I N E S
III
N T E N T S
Internet and Private Purchases PURCHASER’S Agreement
N T R O D U C T I O N
Shipping and Delivery
Information Exchange
S a F E T Y
Product Safety Symbols
S a F E T Y
Lifting Capabilities
Installation
Lifting NON-PRIDE Products
PRE-LIFT Inspection
Lift System Installation
I . Installation
Follow these steps for installation
To raise or lower the upper post
BOOM-ARM Adjustment
See figure
Lift System
To raise or lower the boom arm
Electrical Wiring Installation
I . Installation
O P E R a T I O N
Power Switch Operation
Hand Control Operation
Lifting the Mobility Product
To prevent dragging
To reset the main circuit breaker
Troubleshooting
To restore proper lifting strap travel
Lift will not Operate
Manual Overide Operation
Manual Override Operation
C a R E a N D M a I N T E N a N C E
Storage and Operation Temperatures
Perform prior to daily use
Perform every 6 months
Service Checks and Warranty Service
THREE-YEAR Transferable Limited Warranty
I . W a R R a N T Y
Exclusions also include components with damage caused by
T E S
Page
INFMANU4414
Top
Page
Image
Contents