Manuals
/
Pride Mobility
/
Personal Care
/
Mobility Aid
Pride Mobility
400
manual
T E S
Models:
400
1
18
20
20
Download
20 pages
35.83 Kb
13
14
15
16
17
18
19
20
Troubleshooting
Install
Product Safety Symbols
Commander
BOOM-ARM Adjustment
Power Switch Operation
Page 18
Image 18
N O T E S
18
www.pridemobility.com
Commander 400
Page 17
Page 19
Page 18
Image 18
Page 17
Page 19
Contents
Commander
F E T Y G U I D E L I N E S
N T E N T S
III
Shipping and Delivery
N T R O D U C T I O N
Internet and Private Purchases PURCHASER’S Agreement
Information Exchange
Product Safety Symbols
S a F E T Y
S a F E T Y
Lifting NON-PRIDE Products
Installation
Lifting Capabilities
PRE-LIFT Inspection
I . Installation
Lift System Installation
Follow these steps for installation
See figure
BOOM-ARM Adjustment
To raise or lower the upper post
Lift System
Electrical Wiring Installation
To raise or lower the boom arm
I . Installation
Hand Control Operation
Power Switch Operation
O P E R a T I O N
Lifting the Mobility Product
To prevent dragging
To restore proper lifting strap travel
Troubleshooting
To reset the main circuit breaker
Lift will not Operate
Manual Override Operation
Manual Overide Operation
Perform prior to daily use
Storage and Operation Temperatures
C a R E a N D M a I N T E N a N C E
Perform every 6 months
I . W a R R a N T Y
THREE-YEAR Transferable Limited Warranty
Service Checks and Warranty Service
Exclusions also include components with damage caused by
T E S
Page
INFMANU4414
Top
Page
Image
Contents