Manuals
/
Pride Mobility
/
Personal Care
/
Mobility Aid
Pride Mobility
400
manual
Models:
400
1
19
20
20
Download
20 pages
35.83 Kb
13
14
15
16
17
18
19
20
Troubleshooting
Install
Product Safety Symbols
Commander
BOOM-ARM Adjustment
Power Switch Operation
Page 19
Image 19
Page 18
Page 20
Page 19
Image 19
Page 18
Page 20
Contents
Commander
F E T Y G U I D E L I N E S
III
N T E N T S
Information Exchange
N T R O D U C T I O N
Internet and Private Purchases PURCHASER’S Agreement
Shipping and Delivery
S a F E T Y
Product Safety Symbols
S a F E T Y
PRE-LIFT Inspection
Installation
Lifting Capabilities
Lifting NON-PRIDE Products
Lift System Installation
I . Installation
Follow these steps for installation
Lift System
BOOM-ARM Adjustment
To raise or lower the upper post
See figure
To raise or lower the boom arm
Electrical Wiring Installation
I . Installation
Lifting the Mobility Product
Power Switch Operation
O P E R a T I O N
Hand Control Operation
To prevent dragging
Lift will not Operate
Troubleshooting
To reset the main circuit breaker
To restore proper lifting strap travel
Manual Overide Operation
Manual Override Operation
Perform every 6 months
Storage and Operation Temperatures
C a R E a N D M a I N T E N a N C E
Perform prior to daily use
Exclusions also include components with damage caused by
THREE-YEAR Transferable Limited Warranty
Service Checks and Warranty Service
I . W a R R a N T Y
T E S
Page
INFMANU4414
Top
Page
Image
Contents