Manuals
/
Pride Mobility
/
Personal Care
/
Mobility Aid
Pride Mobility
400
manual
INFMANU4414
Models:
400
1
20
20
Download
20 pages
35.83 Kb
13
14
15
16
17
18
19
20
Troubleshooting
Install
Product Safety Symbols
Commander
BOOM-ARM Adjustment
Power Switch Operation
Page 20
Image 20
*INFMANU4414*
Page 19
Page 20
Page 20
Image 20
Page 19
Page 20
Contents
Commander
F E T Y G U I D E L I N E S
N T E N T S
III
N T R O D U C T I O N
Internet and Private Purchases PURCHASER’S Agreement
Shipping and Delivery
Information Exchange
Product Safety Symbols
S a F E T Y
S a F E T Y
Installation
Lifting Capabilities
Lifting NON-PRIDE Products
PRE-LIFT Inspection
Follow these steps for installation
I . Installation
Lift System Installation
BOOM-ARM Adjustment
To raise or lower the upper post
See figure
Lift System
Electrical Wiring Installation
To raise or lower the boom arm
I . Installation
Power Switch Operation
O P E R a T I O N
Hand Control Operation
Lifting the Mobility Product
To prevent dragging
Troubleshooting
To reset the main circuit breaker
To restore proper lifting strap travel
Lift will not Operate
Manual Override Operation
Manual Overide Operation
Storage and Operation Temperatures
C a R E a N D M a I N T E N a N C E
Perform prior to daily use
Perform every 6 months
THREE-YEAR Transferable Limited Warranty
Service Checks and Warranty Service
I . W a R R a N T Y
Exclusions also include components with damage caused by
T E S
Page
INFMANU4414
Top
Page
Image
Contents