Installation considerations
When the 3WOOD is installed, check that The flue, if reused:
∙Supplies the negative pressure required for the new boiler (see the table of technical specifications on page 10);
∙is suitable for the temperature of the products of combustion, and has been calculated and constructed according to the required standards; recommended by NFPA
∙is as straight as possible, airtight, insulated and is not blocked or choked;
∙is fitted with a cleanout door
∙The heating system should be flushed, cleaned of any slime and deposits, vented and tested for water tightness.
∙The heating system should be equipped with a new expansion tank of sufficient size to handle the volume of both boilers.
∙The 3WOOD Boiler should be equipped with its own
Model # | Min. Output |
| (BTU/HR) |
3Wood 5 | 89,000 |
3Wood 6 | 104,000 |
3Wood 7 | 120,000 |
FIREBOX | Width | Height | |
DEPTH | (inches) | (inches) | |
16.5” |
|
| |
20” | 24” | 38” | |
23.5” | |||
|
|
|
| 1 1/2” |
|
1 1/2” |
|
|
|
Length | WATER | Draft | Weight |
(inches) | CONTENT | (inch) | (LBS) |
25 | 11 | .07 | 695 |
30 | 12.5 | .10 | 804 |
34 | 14 | .12 | 903 |
15