Transporting
Once the packaging has been removed, cut the straps and remove the casing in such a way as to avoid damaging it.
∙If hoisting equipment is available, suitable for the weight of the boiler, use the eyebolts (1) provided on the body to lift it
∙If no suitable hoisting equipment is available, handle the boiler manually, as follows:
∙Remove the fastening screws (2) for the baseboard (3) and take it off, so as to allow the pallet to be tilted
∙Insert a suitably sized bar through the two eyebolts (4) and lift the boiler body.
WARNING
∙Use safety equipment.
∙Must be Installed on non combustible floor or cinder blocks extending at least 16" in front and 8" on either side of the 3 WOOD.
∙Construction of cement block pad under 3WOOD should extend at least 8” to each side of the boiler and extend at least 2” on either side of the chimney connector
CAUTION
The room where the 3WOOD Boiler is installed must be heated and must always comply with the technical standards and the local codes.
Allow for the space required to access the safety / control devices and to perform the maintenance and loading operations.
∙Do Not install the 3WOOD appliances:
∙Outdoors, as they are not designed for this type of installation.
∙In an unheated room.
∙In rooms with exhaust fans.
∙In houses with heat recovery ventilation systems. (HRV) with out having a outside source of ventilation air for the boiler room.
17
Recommended
Minimum Clearances