QHT Boiler Extended Shutdown, Maintenance, Routine Cleaning, ∙Use suitable safety equipment

Models: Boiler

1 40
Download 40 pages 34.95 Kb
Page 36
Image 36
SHUTDOWN

SHUTDOWN

Extended Shutdown:

If the boiler is not used for an extended period, the following operations must be performed:

Close the on-off valves connected to the 3WOOD Boiler.

Remove the ash and clean the flue gas path.

Assess whether the Technical Service needs to be contacted for more through cleaning.

Extended Shutdown: WARNING

Empty the system or add Non– Toxic antifreeze fluids to the heat system if there is danger of frost.

A container with powdered lime should be placed inside the boiler to absorb humidity.

Maintenance:

Periodical maintenance is a legal requirement and is essential for the safety, efficiency and life of the 3WOOD Boiler.

It must be performed by a qualified heating contractor at least once a year so as to clean the entire flue gas path : loading/combustion chamber, smoke box and flues.

Routine Cleaning:

Before starting any cleaning operations wait for the boiler to cool down.

External Cleaning:

The casing can be cleaned using cloths dipped in soap and water.

For hard-to-remove stains, dip the cloth in a mixture of 50% water and denatured alcohol or other specific products. Once finished cleaning, carefully dry the 3WOOD Boiler.

Maintenance: WARNING

Do not use abrasive products, petrol or trichloroethylene.

Always make sure there are NO hot coals underneath the ash.

Use suitable safety equipment.

The boiler is supplied without accessories, as cleaning can be performed using normal household utensils that can be purchased at shops that sell products for stoves and fireplaces.

36

Page 36
Image 36
QHT Boiler manual Extended Shutdown, Maintenance, Routine Cleaning, ∙Use suitable safety equipment