Raypak 155C installation instructions

Models: 155C

1 35
Download 35 pages 10.56 Kb
Page 23
Image 23
Manual background

PILOT SAFETY (Millivolt System)

The heaters equipped with the standing pilot (millivolt system), have pilot generators which act as a safety device to shut off the flow of gas to the main burners and the pilot burner in case the pilot flame is extinguished. The pilot burner must be manually re- lighted to place the heater in operation again. Refer to the lighting instructions provided on the heater label.

PILOT SAFETY (IID Units) ELECTRIC IGNITION

The heater employs a pilot safety which closes the main gas valve within 8/10ths of a second whenever the pilot flame is interrupted. Pilot flame is automatically lit when the device is powered. Unit performs its own safety check and opens the main valve only after the pilot is proven to be lit.

BURNER DRAWER REMOVAL

1.Shut off main electrical power switch to heater.

2.Shut off gas upstream of heater.

3.Remove front door.

4.Disconnect gas line from gas valve.

5.Remove (2) screws that mount burner tray to unit, and (2) screws that secure gas valve to jacket.

6.Disconnect wires that terminate at gas valve.

7.Slide out burner tray.

8.Reverse above procedure to reinstall.

GAS VALVE REMOVAL

1.Shut off gas supply to the heater. Remove gas piping to gas valve inlet.

2.Disconnect wires, pilot tubing and bleed line, if required.

3.Turn vertical gas pipe from manifold slightly and unscrew gas valve.

4.Reverse above procedure to re-install.

MAIN BURNER AND ORIFICE REMOVAL

1.Remove burner drawer. See burner drawer removal procedure.

2.Remove screws and burner hold down bracket.

NOTE: If the heat exchanger is sooted badly, the burner hold down bracket and spacer can become distorted from direct flame impingement and this usu- ally necessitates replacement of these parts.

3.Lift burners from slotted spacers and slide from orifices. Clean with a wire brush.

4.Orifices usually do not need to be replaced. To clean, run either copper wire or wood toothpick through orifice. Do not enlarge hole. To remove orifice, use a socket wrench and remove from manifold. DO NOT overtighten when reinstalling.

Burner Hold Down Bracket

Burners

Fig. # 8057.0

PILOT REMOVAL AND CLEANING

1.Disconnect pilot tubing, and wires from gas valve.

2.Remove pilot assembly from burner tray.

3.Remove pilot from bracket.

4.Remove pilot orifice and air opening (Honeywell MV unit only), and clean with wire or small brush. CAUTION! Do not enlarge hole in pilot orifice.

5.Reverse above procedure to reinstall.

PilotPilot

Air

Opening Manual background

Orifice Manual background

Orifice

HONEWELL PILOT

ROBERTSHAW PILOT

Fig. # 8045.1

Fig. # 8102.0

23

Page 23
Image 23
Raypak 155C installation instructions