Raypak B6000 manual Installation Verification Procedure

Models: B6000

1 51
Download 51 pages 14.6 Kb
Page 20
Image 20

INSTALLATION VERIFICATION PROCEDURE

REGISTER

Before proceeding any further, please verify that the user registration form has been completed and mailed (reference: Registration Card ).

MECHANICAL INSTALLATION

Verify installation has been completed (reference: Mechanical Installation ).

AIR TEMPERATURE SENSOR

Verify installation parameters have been met (reference: Air Temperature Sensor).

WATER TEMPERATURE SENSOR

Verify installation parameters have been met (reference: Water Temperature Sensor).

Verify System Control/Boiler Monitor power wiring connections.

Verify Torque Requirements.

Verify Air Temperature Sensor wiring, must be Belden #8132, #9842 or equivalent.

Verify Water Temperature Sensor wiring, must be Belden #8132, #9842 or equivalent.

Verify Power Test has been completed successfully.

Verify RS485 Communications Cable, must be Belden #9842 or equivalent.

Verify Boiler Monitor Select Switch (SW2) settings.

Verify Installation/Removal of Boiler Monitor Communications Jumper(s) [W1].

Verify Optional Boiler Monitor Control Wiring.

MODEM (Optional)

Perform and/or verify modem installation and hook-up per Raypak Add/On Options P/N 240596 and B6000 BMS Optional Modem Software Documentation P/N 240595.

Page 20

Page 20
Image 20
Raypak B6000 manual Installation Verification Procedure