Extension Pieces (2)

Auger with Carbide Tip

Wire Brush

Fig. # 8154.0

 

 

 

 

TUBE CLEANING PROCEDURE

Establish a regular inspection schedule, frequency depending on local water condition and severity of service. Do not let the tubes clog up solidly. Clean out deposits over 1/16" in thickness.

The heater may be cleaned from the return header side, without breaking pipe connections. It is prefer- able, however, to remove both headers for better visibil- ity through the tubes and to be sure the ground-up lime dust does not get into the system.

Note that you do not remove the top panel or the heater exchanger, generally.

After reaming, mount the wire brush in place of the auger and clean out debris remaining in the tubes.

Another method is to remove the heat exchanger, ream tubes and immerse heat exchanger in non-inhib- ited de-scale solvent for severe scale build-up.

DESOOTING PROCEDURE

CAUTION: SOOT IS COMBUSTIBLE. EXERCISE EXTREME CARE:

Soot will clog areas between fins and cause even- tual tube failure. Any sign of soot at the base of the burners or around the outer jacket indicates a need for cleaning.

1.Remove top and flue collector from cabinet.

2.Remove "V" baffles from heat exchanger.

3.Remove burner drawer. (See burner tray removal).

4.Remove heat exchanger from the heater and wash with a garden hose, making sure soot is removed from spaces between fins.

5.Reverse above procedure to re-install.

NOTE: In extreme cases it may be necessary to do steam cleaning at the local car wash. DO NOT

WIREBRUSH.

COMBUSTION CHAMBER REMOVAL

To remove combustion chamber, you must first have removed the heat exchanger. Unbolt metal com- bustion chamber retainer from top and remove combus- tion chamber panels individually.

REFRACTORY PANELS TOP VIEW

Fig. #RP 8155.0

CONTROL IMMERSION WELL REPLACEMENT (Millivolt and ASME)

1.Shut water off to heater and drain heat exchanger.

2.Remove access panel on water connection side of heater.

3.Remove old control well with bushing and sleeve.

4.Install in header.

NOTE: Installation in plastic should be hand tight plus 1/2 turn.

Well Assembly

Fig. #2010

UNITHERM GOVERNOR (U.G.) REPLACEMENT

1.Shut water, gas and electricity off, close valves and relieve pressure.

2.Drain heat exchanger.

3.Remove retainer plug located next to the outlet pipe connection.

4.Remove old U.G. from retainer plug. It is snapped in place. Snap in new U.G.

5.Reinstall retainer plug, taking care to lubricate gas- ket with a non-petroleum based grease such as AquaLube.

Retainer Plug

U.G.

Spring

Gasket

Fig. #2011

To test the operation of the Unitherm Governor, place in hot water (over 100°F) and watch for movement against spring. If there is no movement, replace unit.

31

Page 31
Image 31
Raypak P-R405A Tube Cleaning Procedure, Desooting Procedure, Combustion Chamber Removal, Refractory Panels TOP View

C-R185A, P-R405A, RP2100 specifications

Raypak is a leading manufacturer in the heating and cooling industry, renowned for its innovative products that cater to both residential and commercial sectors. One of its product lines, the RP2100 series, exemplifies cutting-edge technology and features designed to enhance efficiency and performance in pool heating systems.

The RP2100 models, particularly the P-R185B through R-P405B series, incorporate advanced heat exchanger technology, enabling them to offer exceptional heat transfer efficiency. The titanium heat exchangers are designed for durability and resistance against corrosion, particularly in saltwater environments, ensuring the longevity of the system. These units are engineered for both outdoor and indoor applications, with the versatility to adapt to various heating requirements.

In terms of energy efficiency, the RP2100 series boasts a high coefficient of performance (COP), making them cost-effective solutions for pool heating. They are equipped with digital thermostats that provide accurate temperature control, ensuring consistent heating capabilities while minimizing energy consumption. The inclusion of intelligent controls allows for seamless integration with existing systems and provides users with the ability to schedule heating cycles, further enhancing energy savings.

Moving beyond the RP2100 series, the C-R185B to C-R405B models are specifically tailored for commercial applications, combining robust performance with user-friendly features. These commercial heaters are designed to handle larger volumes of water and are built to withstand the rigors of high-traffic environments, such as resorts and sports complexes. Their vertical design optimizes space and promotes better airflow, which is crucial in high-demand scenarios.

The P-R185BL to P-R405BL and C-R185BL to C-R405BL models feature noise-reducing technology, making them suitable for residential settings where peace and quiet are paramount. They utilize advanced acoustic insulation materials that minimize operational noise without sacrificing performance.

In summary, the Raypak RP2100, P-R185B to R-P405B, C-R185B to C-R405B, P-R185BL to P-R405BL, and C-R185BL to C-R405BL series represent the pinnacle of innovation in pool heating solutions. With their durable construction, energy-efficient designs, and advanced technologies, these models are ideal for users seeking reliability, efficiency, and quiet operation in both residential and commercial environments. Investing in Raypak products ensures superior heating performance, longevity, and overall satisfaction.