Installing the water heater.

Vertical Vent Termination Location

Small (6” min) (15 cm) section of vent

Elbow

The location of the vent terminal depends on the following minimum clearances and considerations (see illustration):

Minimum twelve (12) inches (30 cm) above roof.

Minimum twelve (12) inches (30 cm) above anticipated snow level.

Min. 12" (30 cm) Above Roof

Min. 12" (30 cm) Above Anticipated Snow Level.

Max. 24" (60 cm) Above Roof (Without Additional Support)

Vent Pipe

Through Roof

Termination Elbow w/ Protective Screen

Maximum twenty-four (24) inches (60 cm) above roof level without additional support for vent.

Four (4) feet (1 m) from any gable, dormer or other roof structure with building interior access (i.e., vent, window, etc.).

Ten (10) feet (3 m) from any forced air inlet to the building. Any fresh or make-up air inlet such as a dryer or furnace area is considered to be a forced air inlet.

Vertical Vent Installation

Once the vent terminal location has been determined, make a hole through the roof and interior ceiling to accommodate the vent pipe. Complete the vent pipe installation to the water heater's vent connector fitting on the water heater vent collar outlet. Support vertical or horizontal runs as previously mentioned. If required, use silicone sealant at the point the vent connector joins the water heater.

Install adequate flashing where the vent pipe passes through the roof. Determine the vent terminal height and install the vent pipe accordingly. Refer to the illustration above for proper vent terminal height. Connect vent elbow on to vertical pipe through roof. Connect short piece of vent pipe (approximately 6" long (15 cm)) to elbow, and the terminal elbow with the protective screen.

 

Storm

 

 

Storm

 

Rain Cap

 

 

 

 

 

 

 

 

Collar

 

 

 

Collar

 

 

 

 

 

 

 

 

 

Adjustable

 

 

Adjustable

 

 

 

 

 

 

 

 

Roof Flashing

 

 

Roof Flashing

 

Roof Jack

 

Roof Jack

 

 

 

 

 

 

 

 

 

Support

Firestop

 

Support

Firestop

 

 

 

Clamp

 

 

Clamp

 

 

 

 

 

Chase Requires

 

 

Chase Requires

 

 

 

 

6” (15 cm) Clearance

 

 

6” (15 cm) Clearance

 

 

 

 

 

 

to Combustibles

 

 

to Combustibles

 

 

 

 

1/4” per foot upward slope

 

1/4” per foot upward slope

 

 

 

 

 

 

 

3” (8 cm) Clearance

 

 

3” (8 cm) Clearance

 

 

 

 

 

 

 

 

 

 

Firestop

 

 

 

Firestop

 

 

3’

 

 

 

3’

 

Support

 

 

 

 

(91 cm)

 

 

 

(91 cm)

 

Condensate

Support

 

Hanger

 

Max

Max

Condensate

 

Trap

Hanger

 

 

 

Trap

 

 

 

To Drain. Dispose of

 

To Drain. Dispose of

 

 

 

 

condensate in accordance

Vent

condensate in accordance

 

Vent

to local codes

Adapter

to local codes

 

Adapter

 

 

 

 

Alternate

18

Standard Vertical Vent Termination

Vertical Vent Termination with Rain Cap

 

 

Page 18
Image 18
Rheem AP13731 warranty Vertical Vent Termination Location, Vertical Vent Installation