Roberts Gorden 125, 75, 100 service manual Flue Blower Vertical Installation

Models: 125 100 75

1 60
Download 60 pages 21.77 Kb
Page 50
Image 50
15.5 Flue Blower Vertical Installation

UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL

15.5 Flue Blower Vertical Installation

To remove the blower, remove screws securing the fan and mounting plate to the vent box.

To remove the blower from the mounting plate, remove screws.

Refit in reverse order.

To change the vent and air intake orientation from back to top, remove the blower and mounting plate as above.

Remove intake (if applicable) and exhaust covers from top of the heater.

Rotate the blower, mounting plate and gasket clockwise until the flue adapter lines up with the top hole. Secure screws.

If applicable, remove the flexible air duct from the air intake adapter on the back.

If applicable, remove the air intake adapter from the back of the heater and install in the appropriate hole on top. Reconnect the flexible air duct.

Install intake and exhaust covers over the back holes.

NOTE: Separated combustion model shown.

MODEL

UHD[X][S] 75

UHD[X][S] 100

UHD[X][S] 125

 

 

 

 

Flue Blower P/N

90710404

90710405

90710405

 

 

 

 

IT IS IMPORTANT THAT ONLY THE CORRECT FLUE BLOWER SPECIFIED FOR EACH MODEL TYPE IS USED WHEN REPLACING THESE ITEMS.

Carry out a start-up after working on or changing a flue blower. See Page 26, Section 11.

42 of 47

Page 50
Image 50
Roberts Gorden 125, 75, 100 service manual Flue Blower Vertical Installation